back deck done. shou sugi ban siding done. Kitchen counter done. Awnings and railings underway. Sushi doing her best baby seal and opossum impersonations.
And 47 sees the osb floor installed and 4 coats of polyurethane applied. Kitchen cabinets delivered and dad got em installed. Appliances arrived as well. Final plumbing hook up on the 22nd of July. Navigating the barn doors. Sushi has been visiting the house and loves her TV. Painting parts of the exterior prepping for the big deck off the back. And the over height bedframe arrived. Sarah helped get the mattress over - been camping in the tin can some nights. New sofa of a more appropriate size for the house arrived. Sushi claimed it quickly
With snow finally melting,(and first flowers coming up along driveway) the middle of March saw the windows and doors finally cut (really the most nerve racking part of this project to me) but they’re all in. Still weather proofing to do. Inside is studwalled, and plumbing is fully roughed in. Electric rough in starts this week. Spray foam and dry wall waiting in the wings. Also waiting is the new pellet stove which will be main heat source.
Electric finally installed. then the huge bedroom windows (which dad came up for) along with the exterior doors arrive. then winter showed up in full force. next step is to plasma cut doors and windows and then get them installed. pushing for a end of june 2019 move in.
|
Archives
September 2022
Categories |