the moms and pops came up this weekedend - mom bringing along her revisions to the interior.
This past week Green Mountain Power installed the utility pole and ran the line onto the property. Next is for JC Electric to install directly to the house - power for continued welding and construction. Up on the roof looking down at the deck. Blooms keep coming up along the driveway. Fall is here for sure though. Renaud Brothers were back to weld the bottom seam of the two containers, and do a little more cutting out of walls.
Thanks to the tent sale at WW in Wilmington - $2,000 worth of windows for $250. yes please thank you.
Front stairs and deck are DONE!. and Catherine (who I've known for 27 years now!) came to check out the progress on her bedroom. Neighbors came to the rescue with their backhoe to move some stone. Railings are temporary until we install pieces of the old cast iron bridge from Wilder, VT as the handrails and repurpose the walls cut out of the containers as an awning over the front door and the 12' of sliding doors on the back deck. And pulled out the blue Adirondack chairs mom and dad gave me finally!
|
Archives
September 2022
Categories |